TOR or Terms of Reference is a document produced by the authority conducting the EIA study. It is formed during Scoping, the second stage in the EIA process. All the stakeholders are invited to submit their concerns regarding the project during a public hearing organized by the EIA committee, which is followed by discussions and deliberations. The finalized list of this stage of EIA is submitted to the Ministry in the form of TOR.

TOR is an important document in the process of EIA because it sets the guidelines for the study. A TOR is drawn up with the following questions in mind.

  1. The purpose of the study/project.
  2. The extent of the study.
  3. The stakeholders’ requirements; each stakeholder looks at different aspects of the project differently. Complex information needs to be explained appropriately.

Content of TOR

TOR highlights the points that need to be covered(the TOR itself does not elaborate on these points unless required) during the EIA study, which include:

  1. A description of the project, it’s purposes and extent.
  2. All the agencies responsible in the developmental project and the EIA study.
  3. A description of the existing environmental conditions in the project site and surrounding areas.
  4. The stakeholders that will be benefited and harmed by the fulfillment of the project.
  5. The environmental aspects the project is likely to affect.
  6. The impacts, both positive and negative, the project will have on the environmental and social aspects of the project area. This is undertaken through checklists, matrices or networks.
  7. A list/description of the species endemic to the area, which are likely to be effected.
  8. How in-depth does the EIA study need to be: whether baseline data is available or whether the study be sourced from secondary data.
  9. Possible alternatives for the project in terms of design, site, technology, implementation, etc.
  10. The legal requirements of the project and future legislation that need to be drafted.
  11. If the project site comes under special categories, and the legislation regarding the same.
  12. Recommended mitigation strategies.
  13. The expertise required for the EIA study.
  14. The expected time limit for the entire EIA study.
  15. Natural Resource Valuation (NRV), if possible.
  16. The budget of the study, also called cost-benefit analysis.

It is important that the TOR be drawn up exhaustively to ensure that the EIA study carried out is effective in warding off as much environmental damage as possible. TORs take about 45 days to prepare in today’s EIA studies.

Advertisem*nts

Under the Ministry of Environment, Forests and Climate Change guidelines, reference TORs for the most common developmental projects have been drawn up in the ministry website. This reference document lists out the most important aspects and impacts of large, common developmental projects. This eases the burden on the EIA committees working to conduct EIA of large projects. They take most of the information to be mentioned in the TOR from this reference. All that is included from their side are site specific issues that arise for each individual project; for example, the presence of a unique ecosystem in the area (mangroves etc), presence of protected areas in the project vicinity, etc.

Environmental Impact Assessment – Terms of Reference (1)

You can check out an example of a TOR produced for a Resort inBig And Little Pelican Cay
Portland Bight, St. Catherine, Jamaica.

References:

  1. http://environmentclearance.nic.in/
  2. http://www.fao.org/docrep/v8350e/v8350e0d.htm
  3. http://elaw.org/system/files/tor-eia.pdf
  1. Oh.my.god!! This is actually a big thing.

    LikeLiked by 1 person

    Reply

    • lol yes 😛

      LikeLiked by 1 person

      Reply

  2. […] This process occurs during the scoping stage of EIA; running parallel to the preparation of the Terms of Reference. It is important to note that at this stage, the focus is NOT on quantitative or qualitative […]

    LikeLiked by 1 person

  3. […] baseline study, impact assessment in the form of checklists/matrices/networks and creating a ToR), we come to the third step of Environmental Impact Assessment: Prediction and […]

    LikeLike

    Reply

  4. […] strengthened through this notification. Now, all Category A and B1 projects needed to submit a Terms of Reference.The ToR is drafted by the EAC either on its own or by consulting the project proponents and other […]

    LikeLiked by 1 person

    Reply

  5. […] the same reason is to be added in the question supporting the document. For category B1 projects, Terms of Reference (ToR) is […]

    LikeLike

    Reply

  6. […] the same reason is to be added in the question supporting the document. For category B1 projects, Terms of Reference (ToR) is […]

    LikeLike

    Reply

  7. The information is valid and helpful

    LikeLike

    Reply

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Environmental Impact Assessment – Terms of Reference (2024)
Top Articles
Latest Posts
Article information

Author: Wyatt Volkman LLD

Last Updated:

Views: 5805

Rating: 4.6 / 5 (46 voted)

Reviews: 85% of readers found this page helpful

Author information

Name: Wyatt Volkman LLD

Birthday: 1992-02-16

Address: Suite 851 78549 Lubowitz Well, Wardside, TX 98080-8615

Phone: +67618977178100

Job: Manufacturing Director

Hobby: Running, Mountaineering, Inline skating, Writing, Baton twirling, Computer programming, Stone skipping

Introduction: My name is Wyatt Volkman LLD, I am a handsome, rich, comfortable, lively, zealous, graceful, gifted person who loves writing and wants to share my knowledge and understanding with you.