Free PPAP Checklist | PDF | SafetyCulture (2024)

Published 8 Mar 2024

Article byJona Tarlengco

|3 min read

What is PPAP?

Production Part Approval Process (PPAP) is an 18-step guideline for Original Equipment Manufacturers (OEMs) and suppliers. PPAP documents show that OEMs and suppliers understand customer specifications and ensure that their manufacturing process consistently produces conforming parts at the quoted production rate. Customers examine the PPAP documents and determine the production part approval process status—fully approved, interim approval, or rejected.

What is a PPAP Checklist?

A PPAP checklist is used by quality managers to easily detect mismatched process flows, FMEAs, and control plans; ensure the complete, accurate, and timely submission of PPAP documents such as Design Records, Appearance Approval Report (AAR), and Initial Sample Inspection Report (ISIR); and gain full approval for production and shipment of parts.

3 Common PPAP Mistakes and How to Avoid Them

Free PPAP Checklist | PDF | SafetyCulture (1)

Due to the methodical and comprehensive nature of the production part approval process, quality managers often overlook some customer-specific requirements. When PPAPs get rejected, OEMs and suppliers inevitably waste time and resources to implement corrections for resubmission. Here are 3 common mistakes during the PPAP and how to avoid them:

1. Ineffective Communication Between Supplier and Customer

Quality managers should work closely with the PPAP evaluator to provide exactly what the customers are looking for, especially when there are engineering changes and the master sample needs sign-off from both parties. During the contract review, clarify customer specifications with FMEA teams, design engineers, and manufacturing personnel to facilitate effective communication in the manufacturing facility as well.

2. Mismatched Process Flows, FMEAs, and Control Plans

There should be a clear link from the Design FMEA and Process FMEA to the Process Flow Diagram and Control Plans. Quality managers should consider all known special characteristics and address all high-risk failure modes with executable action plans to accurately demonstrate all manufacturing operations, handling techniques, inspection steps, and alternate/backup processes. Detailed and complete process control plans should be in place and include all print, specification, attribute, and purchase order requirements.

3. Mismanaged PPAP Documents

Most PPAP revisions get rejected because of avoidable clerical shortcomings. Quality managers should provide evidence that the FMEA is a living document, a special characteristics deviation waiver is available, and non-conformance in any of the PPAP documents is resolved before submission. All PPAP documents should be legible, updated, and reviewed for completeness.

Understanding your Production Part Approval Process Status and What to Do Next

Free PPAP Checklist | PDF | SafetyCulture (2)

The PPAP evaluator may take some time reviewing the PPAP documents, but quality managers can use the lead time to create fixtures and adjust a few operating parameters. Upon receipt of the PPAP status, here is what OEMs or suppliers should do to move forward:

Fully Approved

Since the part and its PPAP documents have proven that the manufacturing process can consistently produce conforming output, the parts can now be shipped to the customer as scheduled. OEMs and suppliers prevent costly production delays when they meet or even exceed customer expectations.

Interim Approval

If customers see nonconformance in any of the PPAP documents, containment measures should be undertaken by the quality manager. Even when the OEM or supplier is authorized to ship for a defined period of time and/or a limited number of parts only, corrective actions should be implemented and reflected in the resubmission of PPAP documents to gain full approval within 90 days.

Rejected

When the part fails to meet customer-specific requirements or when the PPAP shows inconsistencies in the documentation, the OEM or supplier is not authorized to ship the rejected product. Quality managers should execute corrective actions based on what the customer established as the reason for rejection, and revise PPAP documents accordingly before resubmission.

SafetyCulture (formerly iAuditor) Part Inspection Software: How it Makes Your Process Better

A good part inspection process can catch minor product part issues before they turn into major problems. Similar to a First Article Inspection, the part inspection’s goal is to identify defects and non-conformance in the initial stages of production to avoid wasting resources, time, effort, and the legal repercussions of non-compliance with the mandated design.

Below are some of the ways in which the SafetyCulture helps you improve your part inspection process:

Data Collection, Compilation, and Organization are Streamlined Into One Process

Unlike paper-based templates which require you to manually compile and organize your findings after your inspection, SafetyCulture combines these processes into a single task for maximum efficiency. SafetyCulture automatically saves your data during and after your inspection to ensure that no information is lost. Your inspection data is then automatically transferred to your SafetyCulture web dashboard where you can use search filters to access relevant statistics, individual inspections, and even specific answers. SafetyCulture makes data navigation easy.

Cloud Storage Provides Unparalleled Data Security

Paper documents are susceptible to loss, damage, and unauthorized access. Not to mention the multiple file cabinets eating up more and more useful space as time passes. With the SafetyCulture Part Inspection Software, your data is automatically saved via unlimited cloud storage and secured with the help of permissions that you can set to ensure that only authorized personnel can access specific templates and inspection data.

Real-time Database Updates

Using paper templates makes database updates inefficient; often requiring multiple steps just to complete basic data entry. SafetyCulture automatically updates your database every time your organization completes an inspection anywhere in the world. SafetyCulture gives you access to the latest, most relevant data every time.

Consistent Data Parameters

Part inspections done through paper templates are susceptible to collecting subjective data since inspectors may record the same findings in different ways. In some instances, handwritten notes may also be illegible. SafetyCulture boasts highly customizable answer fields that include short and long text answers, multiple-choice, checkboxes, yes/no, and many more, so you can set the proper parameters to ensure the right data is recorded. Finally, you can include if/then logic fields that reveal or hide sections based on your previous answer to ensure that only relevant data is captured.

Cross-software Integration

SafetyCulture can interact with other software such as Google Docs and Google Sheets for automatic data entry each time you complete an inspection, eliminating the risk of incomplete or incorrect data transfer ever-present when doing manual data transfer. It also gives you the option to automatically generate and send a comprehensive report to designated personnel each time you complete an inspection; making your overall process faster, smoother, and more accurate.

Proper documentation is crucial in getting a PPAP fully approved, but managing paper-based PPAP documents can be tedious and burdensome. Taking advantage of a PPAP checklist app such as SafetyCulture, the world’s most powerful inspection checklist app, can help ensure the accurate and timely submission of PPAP documents and gain full approval for the on-time production and shipment of parts.

We have digitized PPAP checklists and PPAP documents to save you time and help streamline your production part approval process. These templates are 100% customizable and can easily be modified according to your needs.

Digital PPAP Checklists

Inspection template

Powered by

PPAP Documents Checklist

A PPAP documents checklist aims to ensure the accurate and timely submission of production part approval process documents. This PPAP documents checklist contains a PPAP submission assessment for quality managers to evaluate their performance of the PPAP and maximize opportunities for continuous improvement. Easily complete PPAP documents such as measurable system analysis studies, performance and material test results, and checking aids with the use of this checklist.

Inspection template

Powered by

FMEA Template

An FMEA template aims to identify potential problems in a process, product or design and prevent their adverse effects on customers. Describe the process function, identify the mechanism of failure, and determine the RPN with the use of this easy-to-use FMEA template. Design engineers and process improvement teams can customize this FMEA template according to company requirements.

Inspection template

Powered by

Appearance Approval Report Form

An Appearance Approval Report Form aims to document the color evaluation of an appearance item identified on the engineering drawing. This appearance approval report form has been designed to make it easier for quality engineers to specify the reason for submission, sourcing and texture information. Use this appearance approval report form to take or attach relevant photos of an appearance item and evaluate hue, value, chroma, gloss, and metallic brilliance.

Inspection template

Powered by

Initial Sample Inspection Report Form

An Initial Sample Inspection Report Form is prepared and completed by quality inspectors prior to sending sample production parts to the customer for approval. Start by indicating the part name and number, order quantity, and delivery quantity. Identify the scope and extent of the inspection and indicate inspection results as released, released with stipulations or rejected. Finally, capture the digital signature of the customer representative as an agreement to the overall disposition of the intial sample inspection report.

Free PPAP Checklist | PDF | SafetyCulture (3)

  • Free PPAP Checklist | PDF | SafetyCulture (4)
Article by
Jona Tarlengco

Jona Tarlengco is a content writer and researcher for SafetyCulture since 2018. She usually writes about safety and quality topics, contributing to the creation of well-researched articles. Her 5-year experience in one of the world’s leading business news organisations helps enrich the quality of the information in her work.

Free PPAP Checklist | PDF | SafetyCulture (2024)

FAQs

How do I fill out a PPAP document? ›

Essential in automotive and aerospace industries, manufacturers must accomplish seven documents for PPAP:
  1. Product description.
  2. Samples of the part.
  3. Manufacturing process.
  4. Inspection process.
  5. Quality plan.
  6. Part history.
  7. Supplier approval form.
Dec 13, 2023

How long does a PPAP take to complete? ›

The timeline for PPAP can vary widely depending on the complexity of the parts, the level of PPAP required, and the efficiency of communication between suppliers and manufacturers. It can take anywhere from a few weeks to several months.

What is the latest edition of PPAP? ›

Production Part Approval Process (PPAP), 4th Edition.

How many samples are required for PPAP? ›

The AIAG SPC and PPAP manuals recommend at least 100 samples. Sometimes collecting samples can be difficult or costly. Either way, using Minitab's confidence intervals you will get a better sense of the variability and avoid costly mistakes that could come as a result of a small sample size.

What is a PPAP sample? ›

Production Part Approval Process (PPAP) is a valuable tool for establishing confidence in component suppliers and their production processes. In today's competitive manufacturing environment controlling cost and maintaining a high level of quality have become vital to a company's success.

How do I choose my PPAP level? ›

The PPAP submission level chosen is determined by a variety of distinct criteria. Customers may have a desired PPAP submission level for the majority of the parts they purchase, but individual parts may require a different degree of submission. It also relies on the nature of the parts submitted.

Who is responsible for PPAP documents? ›

Who is Responsible for PPAP? Suppliers are responsible for the PPAP process. Responsibilities include maintaining a system that documents all the necessary elements required for PPAP submission.

Do you charge for PPAP? ›

Some manufacturers charge upwards of $300 or more for each PPAP package.

Is PPAP a legal requirement? ›

Suppliers are required to obtain PPAP approval from the vehicle manufacturers whenever a new or modified component is introduced to production, or the manufacturing process is changed.

What are the 5 core tools? ›

5 Core Quality Tools are the essentials of a quality management system in manufacturing. 5 Core Quality Tools consist of APQP, PPAP, FMEA, MSA, and SPC. Goal of 5 Core Quality Tools is to prevent errors rather than detect, creating impactful savings.

What is the difference between Level 2 and Level 3 PPAP? ›

Level 2: PSW with product samples and limited supporting data. Level 3: PSW with product samples and complete supporting data. Level 4: PSW and other requirements as defined by the customer.

How to do a PPAP audit? ›

The 18 elements of a PPAP submission:
  1. Design Records.
  2. Engineering Change Documents.
  3. Customer Engineering Approval.
  4. Design Failure Mode and Effects Analysis (DFMEA)
  5. Process Flow Diagrams.
  6. Process Failure Mode and Effects Analysis (PFMEA)
  7. Control Plan.
  8. Measurement System Analysis (MSA)

What is PSW in PPAP? ›

The Part Submission Warrant (PSW) summarizes the entire PPAP Package. A PSW is required for each part number unless otherwise stated by the customer.

What is a level 1 PPAP? ›

The PPAP levels indicate which documents need to be submitted to the customer, and which can simply be retained by the manufacturer. Level 1 - Part Submission Warrant (PSW) only. Level 2 - PSW with product samples and limited supporting data. Level 3 - PSW with product samples and complete supporting data.

What is SPC in PPAP? ›

(PPAP) Production Part Approval Process. (FMEA) Failure Mode & Effects Analysis. (SPC) Statistical Process Control.

How do I fill out a part submission warrant? ›

It needs to include details such as:
  1. Part Information. Part Name. ...
  2. Suppliers Contact Information. Name of Supplier and/or Vendor Code. ...
  3. The Customers Contact Information. Customers Name and Division. ...
  4. Materials Reporting. ...
  5. Reason for Submission. ...
  6. Requested Submission Level. ...
  7. Submission Results. ...
  8. Declaration.

What is the full form of PPAP document list? ›

PPAP is a common acronym within manufacturing which stands for Production Part Approval Process.

Top Articles
Latest Posts
Article information

Author: Lakeisha Bayer VM

Last Updated:

Views: 6359

Rating: 4.9 / 5 (69 voted)

Reviews: 92% of readers found this page helpful

Author information

Name: Lakeisha Bayer VM

Birthday: 1997-10-17

Address: Suite 835 34136 Adrian Mountains, Floydton, UT 81036

Phone: +3571527672278

Job: Manufacturing Agent

Hobby: Skimboarding, Photography, Roller skating, Knife making, Paintball, Embroidery, Gunsmithing

Introduction: My name is Lakeisha Bayer VM, I am a brainy, kind, enchanting, healthy, lovely, clean, witty person who loves writing and wants to share my knowledge and understanding with you.