Concrete is the most commonly used material when it comes to swimming pool construction. A concrete swimming pool is designed to take up full water load along with the capacity to withstand large pressure loads.

The significant loads on the concrete pool structure are the weight of the earth outside the pool and the weight of water held within the pool. The thrust created varies when the water in the pool is emptied for cleaning purposes. It may or may not cause an effect on the concrete based on the design efficiency.

This article explains the step-by-step procedure to construct a concrete swimming pool, keeping into consideration the essential requirement of swimming pool construction. The standard recommendations vary from region to region, but generally, they follow the same principle and safety requirements.

Contents:

  • Procedure to Construct Concrete Swimming Pool
    • Step 1: Selection of Location and Design
    • Step 2: Excavation of Earth
    • Step 3: Construction of Swimming Pool Base
    • Step 4: Steel Cage Reinforcement
    • Step 5: Pump and Filter System for Swimming Pool
    • Step 6: Concreting in Swimming Pool Construction
    • Step 7: Waterproofing the Concrete Pool
    • Step 8: Construction of Coping
  • Frequently Asked Questions

Procedure to Construct Concrete Swimming Pool

As mentioned before, the design of pool side walls is carried out based on the regulations of the region. Once the design of the pool is fixed, the construction phase is started. The construction of a concrete swimming pool involves the following steps:

Step 1: Selection of Location and Design

The design of the swimming pool is the first step for pool construction. Choose a design suitable for the given land or choose a land area to accommodate a design already planned. The design of the swimming pool mainly involves the shape, depth, area of the pool, the filtration system, and overall size.

The location selected for the pool must be ideal for facilitating regular maintenance. It is recommended to choose a flat terrain, which can help in large cost reduction for excavation and filling process. A land far away from trees helps to avoid pool filled with leaves. The orientation of the swimming pool is best when constructed facing the sun.

Step 2: Excavation of Earth

Once the design and location to construct the swimming pool is fixed, the next procedure is to excavate the area to prepare for construction. It is conducted by the following steps:

  1. Mark the perimeter of the swimming pool using wooden stakes. To accurately locate the area of the swimming pool, extend a tread along the perimeter.
  2. Use a backhoe(or any earth removing equipment) to remove the earth within the perimeter. Always make sure the area enclosed and nearby do not have any drainage, electric line or water line crossing.
  3. Dig the area, taking into consideration the space that is occupied by the swimming pool floor. The dimension of cutting the soil is accurately followed as per the design plan in hand. It can help to get a pool as per desired dimensions.
How to Construct a Concrete Swimming Pool? [PDF] - The Constructor (1)

Step 3: Construction of Swimming Pool Base

Construction of the pool base is one of the essential phases that influences the life of the swimming pool. The excavation is conducted so that the bottom face becomes flat and uniform. If the site has loose soil, then it must be filled and compacted with firm soil.

Compaction can be performed by natural soil or by using gravels. Use aggregates of size between 12 to 40 mm to compact and prepare the base. After adequate filling of compact materials, the base must be compacted with respect to the terrain. Do compaction using a roller or similar equipment based on the area of compaction.

Once the pool base is compacted correctly, pour a small layer of cleaning concrete to the bottom. The thickness of the concrete layer is generally 5 cm.

Always provide the pool base with a pool gradient or slope for easy emptying of water to the filter system. The slope selected must be such that it does not affect the balance of the swimmers. A maximum gradient of 1 in 40 is recommended for a pool that is used by children and non-swimmers. Efficient emptying requires a grade of 1 in 80(As per British and Euro Codes).

Step 4: Steel Cage Reinforcement

Once the excavation of the pool walls and the preparation of the base is finished, the next step is to provide steel reinforcement for the pool wall and the bottom. Here, the shotcrete procedure is followed in which a single steel cage reinforcement is provided throughout the interior surface of the swimming pool. In guniting or shotcrete procedure, the concrete structure is constructed in one piece without any gap between the wall and the floor.

Note: The concrete can be placed either through shotcreting or by concrete formworks. While constructing using formworks, the walls and the floor base are made as two parts. A gap is left to allow the flow of water.

After providing steel reinforcement, place the essential plumbing lines, drainage lines, etc. within the cage arrangement. The provision for stairs on the sides are also as per the design.

How to Construct a Concrete Swimming Pool? [PDF] - The Constructor (2)

Step 5: Pump and Filter System for Swimming Pool

A filter system and pump, together, are arranged on a large tank, either made of concrete, metal, etc. Before concreting, the plumb lines are provided to take water from the swimming pool to the filter system and back to the swimming pool.

The filter system and pump are also connected to the municipal water line to take fresh water to the pool. The arrangement is necessary to replace the water lost from the pool due to splash out or evaporation.

Step 6: Concreting in Swimming Pool Construction

Perform the shotcreting or guniting of walls and floors by a concrete of standard mix. Use special tools to shape the surface as per the design. After finishing the concrete, it must be cured twice a day for 14 days.

How to Construct a Concrete Swimming Pool? [PDF] - The Constructor (3)

Generally, the thickness of the concrete base and walls of the pool determines the durability. More the thickness, less is its exposure to fissures and cracks. Generally, the thickness of the bottom of the pool is provided greater than the walls. For safety, a standard pool shell requires a minimum thickness of 6 inches, excluding the plaster(As per The American National Standards Institute(ANSI)).

Among the construction methods (Using formwork and shotcrete), the most optimal option is the construction by shotcreting. This method develops a monolithic structure that holds the force better. In the formwork method, walls and floor have a gap which has chances to get separated. Providing more thickness to the formwork can help to avoid this problem.

Step 7: Waterproofing the Concrete Pool

The most popular ways to waterproof concrete pool are by using tiles, glass, ceramic, or use of epoxy-cement system or any waterproofing membrane. The selection of the waterproofing method is performed based on the water table level of the area and moisture conditions of the soils. The waterproofing of walls and floors is done to make it watertight.

Step 8: Construction of Coping

Coping is the walking room provided around the pool’s edge. It can be made either by concrete, marble, tile, or stone. Always wait for two to three days after the construction of coping to fill the pool.

How to Construct a Concrete Swimming Pool? [PDF] - The Constructor (4)

Frequently Asked Questions

1. How to construct a concrete swimming pool structure?

The concrete swimming pool structure can be constructed either by shotcrete or guniting or formwork methods. The shotcrete and guniting process constructs the walls and base of the pool as a single unit. The formwork method creates the wall and pool base as two units. The first method is more popular.

2. How to choose the location for Swimming Pool?

The location selected for the pool must be ideal for facilitating regular maintenance. It is highly recommended to choose a flat terrain, which can help in large cost reduction for excavation and filling process. A land far away from trees helps to avoid pool filled with leaves. The orientation of the swimming pool is best when constructed facing the sun.
Read More: Basic Requirements for swimming pool construction

3. Why is shotcrete concreting preferred over the formwork method?

Among the construction methods (Using formwork and Shotcrete), the most optimal option is the construction by shotcreting. This method develops a monolithic structure that holds the force better. In formwork method, walls and floor have a gap which has chances to get separated. Providing more thickness to the formwork can help to avoid this problem.

4. How much slope should be provided to swimming pools?

The pool base is provided with a pool gradient or slope for easy emptying of water to the filter system. The grade selected must be such that it does not affect the balance of the swimmers. A maximum gradient of 1 in 40 is recommended for a pool that is used by children and non-swimmers. Efficient emptying requires a grade of 1 in 80 (As per British and Euro Codes).

5. How thick must be a swimming pool?

For safety, a standard pool shell requires a minimum thickness of 6 inches, excluding the plaster. The thickness of the concrete base and walls of the pool determines the durability. More the thickness, less is its exposure to fissures and cracks. Generally, a thickness of the bottom of the pool is provided greater than the walls.

Read More:

  1. What is Shotcrete?
  2. Waterproofing Methods in Building Construction
  3. Concrete Waterproofing
How to Construct a Concrete Swimming Pool? [PDF] - The Constructor (2024)

FAQs

How thick should concrete be for a swimming pool? ›

To be structurally sound, a concrete pool shell should generally be 6 inches thick. Depending on the engineer and the soil condition, it may be more. (On top of that, the plaster interior finish should be at least ⅜ inch thick.) The pool will also need to meet the ANSI/APSP standards.

What materials are used to make a swimming pool? ›

Raw materials for manufacturing swimming pools consist of polyvinyl chloride (PVC) plastic, galvanized steel or metal, fiberglass, concrete, and polyurethane foam.

How do you build a natural swimming pool? ›

The cheapest and most ecologically sound way to build a swimming pool is simply to hollow a hole in the ground. You can make your pool as shallow or as deep as you want, but the key is to make sure the sides slope: Otherwise the soil will cave in. The ratio should be a 1-foot vertical drop for every 3 horizontal feet.

What is concrete pool? ›

What Is A Concrete Pool? Concrete inground pools use a mixture of water, cement, sand, and coarse aggregate (usually stone or gravel) to create a pool shell. This is done by using a sprayer hose rather than the traditional method of pouring concrete.

Can you use regular concrete for a pool? ›

Using regular concrete for your in-ground pool has its advantages. They include: Concrete is pre-mixed, so there are no real concerns about finding the right ratio of materials. It forms a strong coating.

How long does it take to pour concrete for a pool? ›

Concrete pool construction takes a long time.

The average time frame to build a concrete pool is 3–6 months. Within that time, the concrete pool shell has to sit empty for 30 days while the concrete cures. For comparison, a fiberglass pool takes only 3–6 weeks and is full of water by day 2.

How thick is concrete pool deck? ›

The ACI (American Concrete Institute) set parameters for this and require testing and reporting to make sure concrete is made properly. At Mudslingers, we recommend a pool deck have a 4000 psi or stronger mix design, also with a minimum of 3.5-4″ in thickness.

Can you install a pool on concrete? ›

Many wonder though if above ground pools are exclusively used over grass, sand, or soil only and if installing it over concrete is impossible (for fear of it getting punctured). The good news is, yes, you can install your above ground pool on concrete if a sand or soil base is not possible.

What is the most common material used in pool construction? ›

Concrete With Plaster or Aggregate Finishes

Made of steel-reinforced concrete that forms a shell, concrete and plaster are the most common in-ground pool-building materials and were the first ones used when residential pools became popular.

What is the best material to build a pool? ›

If you are shopping for a smooth finish pool with quick and easy installation, Fiberglass is your ideal option. This pool material offers a top non- porous gel coat. Not only is the surface smooth to the touch, it helps to deter algae from forming on the slippery surface.

What is the best pool surface material? ›

Pebble finishes, combined with modified cement, last 15+ years. This is the most durable cement based pool finish. Polished marble finishes are an upgrade to standard marble finishes since the reactive cream layer is polished off the pool finish. You can plan on getting 10+ years from this ultra-smooth pool finish.

What is the process of putting in an inground pool? ›

A typical Vinyl Inground Pool installation will follow the process detailed below:
  1. Permitting. Before any site work can begin, a building permit must be received and posted at the job site. ...
  2. Wall Installation. ...
  3. Pouring the Collar. ...
  4. Backfilling and Grading. ...
  5. Deck Forming. ...
  6. Liner Installation and Finish.

Can you DIY a swimming pool? ›

Can You Build Your Own DIY Pool? The short answer to this question is yes. If you wanted to, you could dig a big hole in your backyard and, with a little effort, turn it into a swimming pool. So instead of asking this question, you need to ask yourself a different question instead.

Top Articles
Latest Posts
Article information

Author: Errol Quitzon

Last Updated:

Views: 6312

Rating: 4.9 / 5 (79 voted)

Reviews: 86% of readers found this page helpful

Author information

Name: Errol Quitzon

Birthday: 1993-04-02

Address: 70604 Haley Lane, Port Weldonside, TN 99233-0942

Phone: +9665282866296

Job: Product Retail Agent

Hobby: Computer programming, Horseback riding, Hooping, Dance, Ice skating, Backpacking, Rafting

Introduction: My name is Errol Quitzon, I am a fair, cute, fancy, clean, attractive, sparkling, kind person who loves writing and wants to share my knowledge and understanding with you.