Production Part Approval Process I PPAP (2024)

When searching for a potential supplier for critical components, such as a bearingsor bushings, it is important to ensure that the supplier is capable of conducting the Production Part Approval Process (PPAP). A supplier that has a proven record of fulfilling the requirements of the PPAP is going to be a more reliable and trustworthy partner.

What is a PPAP?

The PPAP is a critical risk identification and mitigation process used to ensure the supplier is capable of meeting customer’s supply and quality demands. The PPAP is designed to identify and correct any potential issues to the product or process before they occur.

The PPAP process allows the manufacturer to communicate and approve the production designs and processes before, during, and after manufacture. The Automotive Industry Action Group (AIAG) has developed a common PPAP standard as part of the Advanced Product Quality Planning (APQP) that is generally accepted.

A new PPAP is presented and approved by the customer whenever:

  • A new part is required
  • An existing part is changed
  • There is a change in the manufacturing process
  • The manufacturer’s location changes
  • A change in the supply chain is made

PPAP Levels

There are five distinct PPAP levels (level 1 – level 5) which each have a different set of requirements. Based on the level, there are 19 elements (documents) that may or may not be included in a PPAP (see list of PPAP elements below).

In every PPAP level, the Part Submission Warrant (PSW) is required. The PSW document simply summarizes the contents of the PPAP package and must be approved by both parties.

A Level 3 PPAP is the most common as it is the most robust of the five levels. A Level 3 PPAP requires the PSW to be submitted along with product samples and complete supporting data. A Level 3 PPAP is often required when working with a new supplier and/or changing to a new part.

The Bottom Line

The PPAP is a vital first step in establishing a sound and reliable relationship with a supplier. It allows both parties to set the groundwork for what is expected in the partnership. A supplier who can complete the PPAP is much more likely to meet the quality requirements for the critical components. These components, the bearings, bushings, assemblies, etc. must all be of highest quality to ensure that friends and families can travel safely in their vehicles.

List of PPAP Elements

  1. Design Records
  2. Authorized Engineering Change Documents
  3. Engineering Approval
  4. Design Failure Mode and Effects Analysis (DFMEA)
  5. Process Flow Diagrams
  6. Process Failure Mode and Effects Analysis (PFMEA)
  7. Control plan
  8. Measurement System Analysis Studies (MSA)
  9. Dimensional Results
  10. Records of Material / Performance Tests
  11. Initial Sample Inspection Report
  12. Initial Process Studies
  13. Qualified Laboratory Documentation
  14. Appearance Approval Report (AAR)
  15. Sample Product Parts
  16. Master Sample
  17. Checking Aids
  18. Customer-Specific Requirements
  19. Part Submission Warrant (PSW)
Production Part Approval Process I PPAP (2024)

FAQs

Production Part Approval Process I PPAP? ›

The Production Part Approval Process (PPAP) handbook is an industry standard that outlines the process to demonstrate engineering design and product specifications are met by the supplier's manufacturing process.

What is a level 1 PPAP? ›

The PPAP levels indicate which documents need to be submitted to the customer, and which can simply be retained by the manufacturer. Level 1 - Part Submission Warrant (PSW) only. Level 2 - PSW with product samples and limited supporting data. Level 3 - PSW with product samples and complete supporting data.

What are the three phases of PPAP? ›

PPAP is performed in three stages: planning, production, and post-production. In the planning stage, the supplier and customer work together to create a PPAP submission that includes a part description, manufacturing process details, and quality control plans.

What is production process and product approval report? ›

Production Process and Product Approval (PPF) – a Definition

This equally includes legal, regulatory and approval-relevant requirements, standards, technical specifications and customer-specific requirements as well as contractual agreements between the organization and the customer.

What is the first part approval? ›

Generally, it is the inspection that is done to the first piece that comes off of an assembly line or manufacturing process, AFTER A CHANGE IS MADE. The First Piece Approval goes over the new part and makes sure the new features/shapes are in place and working.

What is Production Part Approval Process level 3? ›

PPAP Level 3 – PSW with product samples and complete supporting data. What is it PPAP Level 3? PPAP Level 3 (Production Part Approval Process) is the 3rd level of the automotive industry standard that ensures engineering design and product specification requirements are met.

What are the 5 phases of APQP? ›

The Five Phases of APQP: An Overview. The APQP process is divided into five stages. It consists of Planning, Product Design and Development, Process Design & Development, Product and Process Validation, On-going Production, Use and Post-deliver Service.

What is the timeline for PPAP? ›

The timeline for PPAP can vary widely depending on the complexity of the parts, the level of PPAP required, and the efficiency of communication between suppliers and manufacturers. It can take anywhere from a few weeks to several months.

What is process flow diagram in PPAP? ›

Process Flow Diagram, also known as a process flow chart, shows the document and clarifies all steps required in the manufacturing of the part in question. The process flow diagram must match both the control plan and the Process Failure Mode and Effects Analysis (PFEMA).

What is a PPAP checklist? ›

PPAP (Production Part Approval Process) relies on a framework of documents, customer requirements, and authorizations to ensure that a supplier produces parts reliably and repeatedly. The PPAP Requirements Checklist answers the following questions. Are all required documents complete and approved?

What is PPAP interim approval? ›

Interim PPAP Approval Forms (PSWs) allow suppliers and customers to approve shipment of parts either for a set period of time and/or for a number of parts. The PPAP Approval Form (PSW) serves to confirm the APQP record's contents and and is used to submit and approve the APQP process as a whole.

How to do a PPAP audit? ›

The 18 elements of a PPAP submission:
  1. Design Records.
  2. Engineering Change Documents.
  3. Customer Engineering Approval.
  4. Design Failure Mode and Effects Analysis (DFMEA)
  5. Process Flow Diagrams.
  6. Process Failure Mode and Effects Analysis (PFMEA)
  7. Control Plan.
  8. Measurement System Analysis (MSA)

What is meant by production part approval? ›

The Production Part Approval Process (PPAP) is a framework of requirements used in the automotive supply chain to establish confidence in suppliers and their manufacturing processes.

Who is responsible for PPAP? ›

Who is Responsible for PPAP? Suppliers are responsible for the PPAP process. Responsibilities include maintaining a system that documents all the necessary elements required for PPAP submission.

What are the 4 parts of the production process? ›

They are commonly broken down into four elements: land, labor, capital, and entrepreneurship. Depending on the specific circ*mstances, one or more factors of production might be more important than the others.

What is a level 3 PPAP? ›

Level 3 PPAP – PSW with Limited Supporting Data:

Submission of the PSW along with additional supporting documents. This level involves more comprehensive testing and validation data than Level 2.

What is PPAP Phase 0? ›

Phased PPAP organizes the Production Part Approval Process into four phases: Phase 0: 'Run-at-Rate' ❑ Phase 1: 'Quality Verification' ❑ Phase 2: 'Production Verification' ❑ Phase 3: 'Capacity Verification'.

What is the PPAP standard? ›

The Production Part Approval Process (PPAP) handbook is an industry standard that outlines the process to demonstrate engineering design and product specifications are met by the supplier's manufacturing process.

What stage is PPAP in APQP? ›

PPAP is an output of Phase 4, Product & Process Validation, of the APQP process. The ongoing use of PPAP ensures risk will be minimized through effective change control.

Top Articles
Latest Posts
Article information

Author: Rob Wisoky

Last Updated:

Views: 6180

Rating: 4.8 / 5 (48 voted)

Reviews: 87% of readers found this page helpful

Author information

Name: Rob Wisoky

Birthday: 1994-09-30

Address: 5789 Michel Vista, West Domenic, OR 80464-9452

Phone: +97313824072371

Job: Education Orchestrator

Hobby: Lockpicking, Crocheting, Baton twirling, Video gaming, Jogging, Whittling, Model building

Introduction: My name is Rob Wisoky, I am a smiling, helpful, encouraging, zealous, energetic, faithful, fantastic person who loves writing and wants to share my knowledge and understanding with you.